Full Structure · Foundation to Ridge

Turn-key new construction framing

Complete framing packages for custom homes and spec builds — floor systems, walls, stairs and roof structure, coordinated directly with your builder, engineer and inspector.

A framing package is the last moment in a build where mistakes are cheap. Everything after us inherits our lines.

If the walls are out of plumb, the cabinet installer eats it. If the floor system bounces, the tile cracks. If the rough openings were eyeballed instead of framed to the manufacturer spec, every window in the house fights its installer. None of that is visible at framing, and all of it is permanent.

So we do the unglamorous things. We shoot the foundation for level and verify it is square to the plan before a plate is cut. We crown and cull every stick. We plumb, line and brace every wall before sheathing, then check it again. We frame openings to the actual unit being installed.

Working with your team

We read both the architectural and the structural plan sets and flag conflicts between them before they become field problems — because they nearly always exist, and finding them at framing is a phone call while finding them at drywall is a change order.

You get a line-item estimate with a full lumber takeoff, usually within five business days of receiving plans.

Stick-framed roof structure viewed from inside the attic with hurricane ties at every rafter
Roof structure framed and connected. A metal tie at every rafter seat, because wind does not push a roof down — it lifts it.
What’s Included

Sill plate to ridge, one crew.

Floor Systems

Joists, girders and subfloor

Engineered I-joists or dimensional lumber, rim, blocking, and subfloor glued and screwed — because a nailed-only subfloor will find its voice in about three years.

Walls

Plumb, lined and braced

Plates, studs, headers, corners and backing. Every wall plumbed and lined before sheathing, held within an eighth of an inch over eight feet.

Roof Structure

Rafters or trusses

Stick-framed or truss-set, ridge and ceiling joists, and the ventilation detailing that keeps your attic dry.

Sheathing

Nailed to schedule

Wall and roof sheathing installed to the specified nailing pattern — the pattern is what makes it a shear wall, and it is what inspectors write up.

Stairs

Cut on site, true rise

Consistent rise and run within code tolerance, because a stair with one odd riser is something people trip on for thirty years.

Hardware

Per the engineering schedule

Hangers, hurricane ties, hold-downs and straps. A continuous connection from ridge to foundation, walked with the inspector.

How It Runs

A fixed cadence, start to sign-off.

01

Plan review & takeoff

We read both plan sets, do a full material takeoff, flag conflicts, and return a line-item estimate. Usually five business days.

02

Layout & snap

We shoot the foundation for level, verify square to the plan, and snap every wall line before cutting. Errors caught here cost pennies.

03

Frame, plumb & line

Floors, walls and roof in sequence. Everything plumbed, lined and braced before sheathing, then re-checked.

04

Hardware & punch walk

Connectors installed per schedule, frame walked with you and the inspector. We are on site for the framing inspection, every time.

Request an Estimate

Send the plans.

Architectural and structural drawings get you the tightest number. We return a line-item estimate with a full lumber takeoff.

Bitwood Build ยท Parent Company

Need the whole project built — not just framed?

The Framing Crew is the structural division of Bitwood Build, a full-service Atlanta general contractor. If your project needs design, permitting, mechanicals, insulation, drywall, trim, and finishes on top of the frame, one call covers all of it — the same crew standard, one point of accountability, one schedule.

  • Whole-home remodels
  • Kitchen & bathroom remodels
  • Home additions, turn-key
  • Basement renovations
  • New residential construction
  • Home renovations & restorations