Vertical Expansion

Second-story additions, framed and dried in fast

Full second-floor build-ups — engineered floor systems over existing walls, new roof structure, and dried in fast to protect the home below.

On tight intown Atlanta lots, going up is often the only direction available. Setbacks, tree ordinances and lot coverage limits close off going out long before the budget does.

It is also the most exposed work in residential construction. For a period measured in days, your house has no roof. Everything about how we plan a second-story addition is organized around shortening that window and protecting what is underneath.

Before anything comes off

The house below was designed to carry one story. Adding a second means the existing walls, and often the foundation, have to be verified — sometimes reinforced — before the first shingle is pulled. That is an engineering exercise and it happens on paper, early.

The question that decides the schedule

How fast can we get from tear-off to dried-in? We stage material, sequence the crew, and watch the forecast, because in Atlanta the difference between a good week and a bad one is measured in ruined drywall downstairs.

You should also plan to be out of the house for part of it. It is not on the estimate, but it is a real cost and it is better to hear it now.

Second-story addition framed and partly sheathed above an existing brick ranch at dusk
Tear-off to dried-in is the whole game. Everything about how we sequence a build-up is organised around shortening that window.
What’s Included

Up, over, and closed in.

Structural Verification

Can the house carry it?

Existing walls and foundation checked against the new load before anything is removed. Reinforcement, where required, happens first.

Tear-Off

Controlled removal

The existing roof comes off in a planned sequence with weather protection staged and ready, not improvised.

Floor System

Engineered, over existing walls

I-joists or dimensional lumber sized for the span, landing on the existing bearing lines, with load carried down through the structure below.

Walls & Roof

New structure up

Second-floor walls plumbed and lined, new roof framed, sheathed and ready. Speed here is a safety feature, not a shortcut.

Stairs

The opening below

A new stair means a structural opening in the existing floor — headers, trimmers and load transfer, plus consistent rise and run.

Dry-In

The priority

Sheathed, wrapped and weather-tight as fast as the sequence allows, so the finished space below is never at risk.

How It Runs

The sequence that protects the house.

01

Engineering first

Existing structure verified for the new load. Reinforcement scoped and priced before demolition is scheduled.

02

Stage & sequence

Material on site, crew sized, forecast checked. We do not start a tear-off we cannot close in.

03

Tear-off & floor

Roof off, floor system in, and the house has a working deck over it again quickly.

04

Walls, roof & dry-in

Walls up, roof framed and sheathed, weather-tight. Then hardware per schedule and the framing inspection.

Request an Estimate

Going up?

Send plans or photos of the house. We will tell you what the framing involves, what has to be verified first, and what the schedule realistically looks like.

Bitwood Build ยท Parent Company

Need the whole project built — not just framed?

The Framing Crew is the structural division of Bitwood Build, a full-service Atlanta general contractor. If your project needs design, permitting, mechanicals, insulation, drywall, trim, and finishes on top of the frame, one call covers all of it — the same crew standard, one point of accountability, one schedule.

  • Whole-home remodels
  • Kitchen & bathroom remodels
  • Home additions, turn-key
  • Basement renovations
  • New residential construction
  • Home renovations & restorations